«  Basement Storage room Junior architect...»

16.07.2008

The plaster phase has started

Category: Structural work, Brick Walls, Pool

By: Catrin

Cyprus Villa Peyia Casa7

Cyprus Villa Peyia Casa7 - second code of plaster

Cyprus Villa Peyia Casa7 - the safety net

Cyprus Villa Peyia Casa7 - I think one of them is not pleased

Cyprus Villa Peyia Casa7 - plaster tools

Cyprus Villa Peyia Casa7 - My pool to be

Cyprus Villa Peyia Casa7 - the plug :)

16. July 2008. We are now in the plaster phase. On the ground floor they started to apply the second coat of plaster on the brick work. Before they start applying the second code, they attach a net. I asked Christakis, if this is the safety net in case the walls cave in…

Christakis also applied a first layer of concrete to the bottom of the swimming pool. I wonder if the red dot is the place for the stopper/plug :) . I suppose in case I want to drain the pool...Pafilia will also supply the necessary dynamite stick.

Hard to believe that I will be swimming in this hole in 6-8 months :)



Login

Choose a language
 
You are visitor no. 293701
since 25.01.2008
 
Change Management
As of 20.05.2012:

Open Issues: 6

Closed Issues: 11


 

Interesting Links and our Recommendations

 
 

Zaggoulos Pafos - Tiles & Bathroom Utilities

This is the shop were we bought most of our tiles... visit www.zaggoulos.com

 
 

Bathroom Enclosures

Pafilia subcontracted our bathroom enclosures to Konikkos, a shower specialist in Pafos. Mr. Charalambos Dionysiou, the Managing Director, paid attention to every detail of the shower cabinets. The result was perfect, 100 points! Visit www.shower.com.cy/ for details.

 
 

Painting + Devorating: www.bravedecor.com

If you are looking for special panting like venetian plaster, airbrushing or faux finishes call Alex 99855722,

 
 

Home Security Pafos

I have been working with B&I Property Management for years.