«  Status 24 March Ground Floor: Pealing...»

18.03.2008

Ground floor ceiling

Category: Structural work

By: Catrin

click on image

The pillars are prepared, the concrete is drying. The next step is to prepare the moulds for the ceiling. Pretty soon the ground floor will be ready. The team does an excellent job. All pillars and walls are straight and the cement is without any pockets. The weather is fantastic like most days and it seems the team enjoys working on this project.



Login

Choose a language
 
You are visitor no. 293701
since 25.01.2008
 
Change Management
As of 20.05.2012:

Open Issues: 6

Closed Issues: 11


 

Interesting Links and our Recommendations

 
 

Zaggoulos Pafos - Tiles & Bathroom Utilities

This is the shop were we bought most of our tiles... visit www.zaggoulos.com

 
 

Bathroom Enclosures

Pafilia subcontracted our bathroom enclosures to Konikkos, a shower specialist in Pafos. Mr. Charalambos Dionysiou, the Managing Director, paid attention to every detail of the shower cabinets. The result was perfect, 100 points! Visit www.shower.com.cy/ for details.

 
 

Painting + Devorating: www.bravedecor.com

If you are looking for special panting like venetian plaster, airbrushing or faux finishes call Alex 99855722,

 
 

Home Security Pafos

I have been working with B&I Property Management for years.