18.06.2008

Electrical Installation Ground Floor

Category: Garden, Structural work, Property, Electrical Installations, Brick Walls, Pool

By: Catrin

Cyprus Villa Peyia Casa7 - click to enlarge

Cyprus Villa Peyia Casa7 - sockets here!

Cyprus Villa Peyia Casa7 - last touch on brick wall

Cyprus Villa Peyia Casa7 - the wooden panel’s construction is prepared

Cyprus Villa Peyia Casa7 - the side roof is a complicated construction

Cyprus Villa Peyia Casa7 - the pool area is marked

On Catrin´s floor the electrician is flagging the walls with paint for sockets and switches. The craftsman is preparing the last layer of bricks on the Ground Floor. Meanwhile the roof on the top floor is moulded. The side overhang on Axel´s floor is being prepared. The special design construction is complicated and has not been done before by Pafilia. Also Christakis has sprayed with white paint the pool area. So far the project is on time. All people working on the construction site seem highly motivated. It is fun working with them!



Login

Choose a language
 
You are visitor no. 293701
since 25.01.2008
 
Change Management
As of 20.05.2012:

Open Issues: 6

Closed Issues: 11


 

Interesting Links and our Recommendations

 
 

Zaggoulos Pafos - Tiles & Bathroom Utilities

This is the shop were we bought most of our tiles... visit www.zaggoulos.com

 
 

Bathroom Enclosures

Pafilia subcontracted our bathroom enclosures to Konikkos, a shower specialist in Pafos. Mr. Charalambos Dionysiou, the Managing Director, paid attention to every detail of the shower cabinets. The result was perfect, 100 points! Visit www.shower.com.cy/ for details.

 
 

Painting + Devorating: www.bravedecor.com

If you are looking for special panting like venetian plaster, airbrushing or faux finishes call Alex 99855722,

 
 

Home Security Pafos

I have been working with B&I Property Management for years.