Cyprus Villa Peyia Casa7 - click to enlarge

Cyprus Villa Peyia Casa7 - sockets here!

Cyprus Villa Peyia Casa7 - last touch on brick wall

Cyprus Villa Peyia Casa7 - the wooden panel’s construction is prepared

Cyprus Villa Peyia Casa7 - the side roof is a complicated construction

Cyprus Villa Peyia Casa7 - the pool area is marked
On Catrin´s floor the electrician is flagging the walls with paint for sockets and switches. The craftsman is preparing the last layer of bricks on the Ground Floor. Meanwhile the roof on the top floor is moulded. The side overhang on Axel´s floor is being prepared. The special design construction is complicated and has not been done before by Pafilia. Also Christakis has sprayed with white paint the pool area. So far the project is on time. All people working on the construction site seem highly motivated. It is fun working with them!
This is the shop were we bought most of our tiles... visit www.zaggoulos.com
Pafilia subcontracted our bathroom enclosures to Konikkos, a shower specialist in Pafos. Mr. Charalambos Dionysiou, the Managing Director, paid attention to every detail of the shower cabinets. The result was perfect, 100 points! Visit www.shower.com.cy/ for details.
![]()
If you are looking for special panting like venetian plaster, airbrushing or faux finishes call Alex 99855722,