«  Staircase Problems and... The plaster phase has...»

27.07.2008

Basement Storage room

Category: Basement Storage Room, Structural work, Foundation

By: Catrin

Cyprus Villa Peyia Casa7

The moulds for the storage room are completed. The concrete has been poured. It is hard to believe that all the excavation is just from the basement… Eventually the rock excavation will be smashed to gravel and used for filling materia



Login

Choose a language
 
You are visitor no. 268946
since 25.01.2008
 
Change Management
As of 05.02.2012:

Open Issues: 6

Closed Issues: 11


 

Interesting Links and our Recommendations

 
 

Zaggoulos Pafos - Tiles & Bathroom Utilities

This is the shop were we bought most of our tiles... visit www.zaggoulos.com

 
 

Bathroom Enclosures

Pafilia subcontracted our bathroom enclosures to Konikkos, a shower specialist in Pafos. Mr. Charalambos Dionysiou, the Managing Director, paid attention to every detail of the shower cabinets. The result was perfect, 100 points! Visit www.shower.com.cy/ for details.

 
 

Painting + Devorating: www.bravedecor.com

If you are looking for special panting like venetian plaster, airbrushing or faux finishes call Alex 99855722,

 
 

Home Security Pafos

I have been working with B&I Property Management for years.