«  Meeting with Pafilia... Meeting with Pafilia...»

05.02.2008

Status Foundation

Category: Foundation

By: Axel

Foundation facing sea

Foundation facing mountains

Roof drainage

Today meeting with our Project Manager Christakis. He explained the status of the foundation. Another layer of about 35cm concrete will be put on the current level. The pipes in the iron construction are for the drainage of the roof and the terrace. The water will go to the back of the house. We can collect the rain water and use it for watering the garden.

 

Christakis pointed out, that the waste water sewage will go into a holding tank under ground. The city of Peyia is planning a sewage pipe system. Pafilia will prepare the property so it may be easily connected to the city sewage pipes once the service becomes available.



Login

Choose a language
 
You are visitor no. 268946
since 25.01.2008
 
Change Management
As of 05.02.2012:

Open Issues: 6

Closed Issues: 11


 

Interesting Links and our Recommendations

 
 

Zaggoulos Pafos - Tiles & Bathroom Utilities

This is the shop were we bought most of our tiles... visit www.zaggoulos.com

 
 

Bathroom Enclosures

Pafilia subcontracted our bathroom enclosures to Konikkos, a shower specialist in Pafos. Mr. Charalambos Dionysiou, the Managing Director, paid attention to every detail of the shower cabinets. The result was perfect, 100 points! Visit www.shower.com.cy/ for details.

 
 

Painting + Devorating: www.bravedecor.com

If you are looking for special panting like venetian plaster, airbrushing or faux finishes call Alex 99855722,

 
 

Home Security Pafos

I have been working with B&I Property Management for years.