«  Moulds for staircase... Status 24 March»

27.03.2008

Ground Floor: Moulds for sealing 80% completed

Category: Structural work, Foundation

By: Catrin

Cyprus Villa Casa7: Ground Floor Sea Front

Click to enlarge Cyprus Villa Casa7: Ground Floor Sea Front

Cyprus Villa Casa7: Ground Floor Mountain Front

Cyprus Villa Casa7: Ground Floor Mountain Front

Cyprus Villa Casa7: Ground Floor Moulds Sealing

Cyprus Villa Casa7: Ground Floor Moulds Sealing

Cyprus Villa Casa7: Ground Floor Entrance

Cyprus Villa Casa7: Ground Floor Entrance

Cyprus Villa Casa7: Ground Floor Staircase

Cyprus Villa Casa7: Ground Floor Staircase

The ground floor is almost completed. Now they start building the staircase. From th front and back you cann well see the progress. Again, best weather conditions for building a villa.... :)



Login

Choose a language
 
You are visitor no. 399964
since 25.01.2008
 
Change Management
As of 18.05.2013:

Open Issues: 6

Closed Issues: 11


 

Interesting Links and our Recommendations

 
 

Zaggoulos Pafos - Tiles & Bathroom Utilities

This is the shop were we bought most of our tiles... visit www.zaggoulos.com

 
 

Bathroom Enclosures

Pafilia subcontracted our bathroom enclosures to Konikkos, a shower specialist in Pafos. Mr. Charalambos Dionysiou, the Managing Director, paid attention to every detail of the shower cabinets. The result was perfect, 100 points! Visit www.shower.com.cy/ for details.

 
 

Painting + Devorating: www.bravedecor.com

If you are looking for special panting like venetian plaster, airbrushing or faux finishes call Alex 99855722,

 
 

Home Security Pafos

I have been working with B&I Property Management for years.